Platform

Fleet Manager, SKU Library,
Propagation Scheduler

Three modules running on the Automcore edge node — all on-premise, all accessible from your facility network browser. No cloud login. No external dependency for day-to-day operations: arm status, pick rates, grasp model coverage, and propagation scheduling from a single interface.

Fleet Manager

Live status across every arm controller in your facility — per-arm pick rates, active propagation progress, confidence validation state, last-sync timestamp, and SKU coverage count. Arms in propagation or training show an estimated completion time. Anomalies — pick rate drop, failed validation, extended sync — trigger alerts in the status feed.

Arm ID Model Picks/hr Status SKUs Trained Last Sync
ARM-01 UR10e 547 Active 218 06:14 AM
ARM-02 UR10e 518 Active 218 06:14 AM
ARM-03 UR10e Propagating 217 Syncing…
ARM-04 FANUC CR-14iA 531 Active 218 06:12 AM
ARM-05 FANUC CR-14iA 489 Active 218 06:12 AM
ARM-06 ABB IRB 2400 514 Active 218 06:13 AM
ARM-07 ABB IRB 2400 556 Active 218 06:13 AM
ARM-08 Yaskawa GP12 Training 217 Pending

SKU Library

Catalog of every trained SKU: training date, grasp confidence score, fleet propagation coverage (how many arms have the active model version), and model version history. Arms running an older version flag as out-of-sync. SKUs below the confidence threshold are queued for follow-up training rather than suppressed from the catalog.

SKU ID Category Trained Confidence Coverage Status
SK-4491 Medium Box 12×8×6 2026-06-08 96.2% 7/8 arms Propagating
SK-4388 Poly Mailer Large 2026-05-22 98.7% 8/8 arms Active
SK-4301 Cylinder Container 4L 2026-05-14 97.1% 8/8 arms Active
SK-4210 Flat Envelope 16×12 2026-04-30 99.2% 8/8 arms Active
SK-4147 Irregular Shape Pkg 2026-04-15 94.8% 8/8 arms Active
SK-4082 Soft Bag Bundle 2026-03-28 97.6% 8/8 arms Active
SK-3991 Foam Insert 8×6×3 2026-03-12 98.1% 8/8 arms Active
SK-3884 Heavy Tote 18kg 2026-02-20 95.3% 8/8 arms Active

Propagation Scheduler

Schedule model propagation events to coincide with your maintenance windows. Enter the window start time and available duration — the scheduler calculates which arms can be updated, in what order, without exceeding the window. Arms that complete validation inside the window go green. Arms that need more time carry over to the next scheduled window. Your operations team gets a pre-production readiness report before first shift.

Upcoming Propagation Events

SK-4491 Fleet Propagation
ARM-03, ARM-08 remaining
Tonight, 02:00–04:30 AM
In Progress
SK-4560 New SKU Training
ARM-01 (trainer) → 7 arms
Fri Jun 12, 10:00 AM
Scheduled
Q3 SKU Batch — 14 new items
All 8 arms
Jun 14–18 maintenance window
Pending

See the full platform in a live demo.

We'll walk through Fleet Manager, SKU Library, and Propagation Scheduler against your actual fleet configuration.